TubeTK/Events/2010.06.14: Difference between revisions

From KitwarePublic
< TubeTK‎ | Events
Jump to navigationJump to search
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 20: Line 20:
*** evaluate a variety of standard deviations for intensity and ridge computations
*** evaluate a variety of standard deviations for intensity and ridge computations
*** compute dot-product between line (hessian) tangent and normal directions in ES and GDS images
*** compute dot-product between line (hessian) tangent and normal directions in ES and GDS images
** Weekly reports to USC (slides)
*** Product: ~ 5 slides to USC illustrating path chosen, strengths, and weaknesses.
* Medium term (1.5 months, August 1)
* Medium term (1.5 months, August 1)
** Report to USC
** Report to USC
Line 29: Line 29:
** Review previous processing pipeline with Stephen
** Review previous processing pipeline with Stephen
** Research on methods for comparing spatial graphs / adjacency matrices
** Research on methods for comparing spatial graphs / adjacency matrices
** Begin Port and test existing adjacency code
* Medium term (1.5 months)
* Medium term (1.5 months)
**  
** Process retinal data
** Complete port and test of existing adjacency code
*** Prepare IJ article


= Hua =
= Hua =
Line 36: Line 39:
* Near term (2 weeks, July 2nd)
* Near term (2 weeks, July 2nd)
** Verify Andinet's code: add tests and help with IJ publication
** Verify Andinet's code: add tests and help with IJ publication
*** Creating tests (sin pattern with known derivatives)
*** Done by next wednesday (June 23)
*** Choose Michel vs BWH
* Medium term (1.5 months
* Medium term (1.5 months
** Investigate use of speckle in ultrasound registration
** Investigate use of speckle in ultrasound registration
** Model-based deformation field interpolation
** 2D-3D registration (data)
** Simulating ultrasound from MR/CT
[[Category:TubeTK Events and Meetings|2010.06.14]]

Latest revision as of 18:45, 26 July 2013

Andinet

  • Primary goal: Data from Duke for BWH
  • Near term (2 weeks, July 2nd)
    • Attend NAMIC AHM
    • Determine what is necessary to record data sent to OpenIGTLink from VectorVision system
      • Define data workflow and software architecture
      • Begin implementation
      • Product: powerpoint presentation: 5 slides
  • Medium term (1.5 months, August 1)
    • Investigate simulation of ultrasound from MR/CT
    • Complete IJ article on tensor diffusion
      • Cite grant proposal in article

Patrick

  • Primary goal: Bump and dent identification on IC images
  • Near term (2 weeks, July 2nd)
    • Explore new features
      • z-score values from three different mean/stdDev joint histograms: add, subtract, and unchanged
      • write program that goes from weiki output to image and computes TPR/FPR scores on that image
      • evaluate a variety of standard deviations for intensity and ridge computations
      • compute dot-product between line (hessian) tangent and normal directions in ES and GDS images
      • Product: ~ 5 slides to USC illustrating path chosen, strengths, and weaknesses.
  • Medium term (1.5 months, August 1)
    • Report to USC

Casey

  • Primary goal: Compare populations of vascular networks
  • Near term (2 weeks, July 2nd)
    • Review previous processing pipeline with Stephen
    • Research on methods for comparing spatial graphs / adjacency matrices
    • Begin Port and test existing adjacency code
  • Medium term (1.5 months)
    • Process retinal data
    • Complete port and test of existing adjacency code
      • Prepare IJ article

Hua

  • Primary goal: ultrasound image processing
  • Near term (2 weeks, July 2nd)
    • Verify Andinet's code: add tests and help with IJ publication
      • Creating tests (sin pattern with known derivatives)
      • Done by next wednesday (June 23)
      • Choose Michel vs BWH
  • Medium term (1.5 months
    • Investigate use of speckle in ultrasound registration
    • Model-based deformation field interpolation
    • 2D-3D registration (data)
    • Simulating ultrasound from MR/CT