ITK/Tcons/Agendas/2011 06 03: Difference between revisions

From KitwarePublic
< ITK‎ | Tcons‎ | Agendas
Jump to navigationJump to search
Line 48: Line 48:
*** Decomposed in tasks for 1/2 days each
*** Decomposed in tasks for 1/2 days each
** Regular short meetings
** Regular short meetings
=== Using JIRA at U.Iowa ===
* Hans setup a Jira installation at U. Iowa
* We could use JIRA to record and track tasks
* Break down targets into sprints
* Break down sprints into tasks


=== Example ===
=== Example ===
Line 65: Line 72:
* Keeps focus
* Keeps focus
* Leads to rapid solution of roadblocks
* Leads to rapid solution of roadblocks
=== Using JIRA at U.Iowa ===
* Hans setup a Jira installation at U. Iowa
* We could use JIRA to record and track tasks
* Break down targets into sprints
* Break down sprints into tasks


= Technical Topics =
= Technical Topics =

Revision as of 11:53, 3 June 2011

How to Join the Tcon

Number to Call

Please be patient, due to some unforeseen circumstances, the call may not start on time...

  • 1-800-728-9607 (in the US) or
  • +1 9139049873 (international)
  • access code 6815251

Webex

Project Management

June Meeting in Chapel Hill

  • Summer_ITKv4_2011_Meeting
  • Will take place on June 27-29
  • Chapel Hill, North Carolina.
  • The Meeting will take place at the Franklin Hotel
  • Registration form will send to you by email.

BETA RELEASE

  • Postponed.
    • New Date : July 30 ?
  • Next Alpha will be tagged on June 15.

ITKv4 Status

  • Lack of Focus
  • Project Schedule
  • State of the Refactoring Efforts ?
  • State of A2D2 ?

Adopting SCRUM

Using JIRA at U.Iowa

  • Hans setup a Jira installation at U. Iowa
  • We could use JIRA to record and track tasks
  • Break down targets into sprints
  • Break down sprints into tasks

Example

  • Sprint for the Summer Meeting
    • What we want ready by that meeting
      • Migration Guide XML uploads to phpfaq
      • Testing data upload (workflow)
      • CVPR Tutorial on ITK+OpenCV
      • Report/Presentation on what is new (&ready) in ITKv4

Kitware

  • We have been using SCRUM for about six month
  • In three different large projects
  • Excellent method for keeping track of goals and intermediate tasks
  • Keeps focus
  • Leads to rapid solution of roadblocks

Technical Topics

Review Tasks

Dashboard

Monolithic Dashboard

Valgrind Errors

  • 2,000 in one Machine? and 0 in another?

Refactoring Workflow

  • Right now
    • code is developed on other remote
    • once the code is mature, we submit to gerrit
    • lost history
    • refactoring may appear as single commit from one person (not team spirit oriented)
  • Any other solution?


Schedule

Teaching ITK

Gerrit Reviews

BinaryFunctorImageFilter

Managing Physical Space

  • Design discussion

Constant Inputs

  • Luis: proposal for backing out changes for supporting constant inputs. Restoring the operation with a constant filters.

SimpleITK