ITK/Tcons/Minutes/2012 02 03: Difference between revisions

From KitwarePublic
< ITK‎ | Tcons‎ | Minutes
Jump to navigationJump to search
(Created page with "= Attendees = = Project Topics = = Technical Topics = == Dashboard == == Gerrit == == Status == = Action Items =")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Attendees =
= Attendees =


* Jim Miller
* Bill Lorensen
* Brad Lowekamp
* Brian Avants
* Luis Ibanez
* Matt McCormik


= Project Topics =
= Project Topics =


* Discussed Freezing process before releases
** Period of release candidates
== Cycles ==
# Development Cycle
# Release candidates run-up (1 per week)
## Introduce fixes (5 days of the RC cycle)
## Freezing 2 days before tagging each release candidate.


= Technical Topics =
= Technical Topics =

Latest revision as of 15:35, 3 February 2012

Attendees

  • Jim Miller
  • Bill Lorensen
  • Brad Lowekamp
  • Brian Avants
  • Luis Ibanez
  • Matt McCormik

Project Topics

  • Discussed Freezing process before releases
    • Period of release candidates

Cycles

  1. Development Cycle
  2. Release candidates run-up (1 per week)
    1. Introduce fixes (5 days of the RC cycle)
    2. Freezing 2 days before tagging each release candidate.

Technical Topics

Dashboard

Gerrit

Status

Action Items