ITK/Release 4: Difference between revisions
From KitwarePublic
< ITK
Jump to navigationJump to search
(→A2D2s) |
(→A2D2s) |
||
(One intermediate revision by the same user not shown) | |||
Line 51: | Line 51: | ||
| [[ITK/Release_4/A2D2_Projects/Video Bridge|Video Bridge]] || X || X || X || X || [[ITK_Release_4/Outreach/Conferences/CVPR_2011 | CVPR Demonstration]] | | [[ITK/Release_4/A2D2_Projects/Video Bridge|Video Bridge]] || X || X || X || X || [[ITK_Release_4/Outreach/Conferences/CVPR_2011 | CVPR Demonstration]] | ||
|- | |- | ||
| [[ITK/Release_4/A2D2_Projects/Registration Parameter Tuning |Registration Parameter Tuning]] || X || X || || || | | [[ITK/Release_4/A2D2_Projects/Registration Parameter Tuning |Registration Parameter Tuning]] || X || X || X || || | ||
|- | |- | ||
| [[ITK/Release_4/A2D2_Projects/VideoGrabber |VideoGrabber]] || || || || || | | [[ITK/Release_4/A2D2_Projects/VideoGrabber |VideoGrabber]] || || || || || | ||
Line 61: | Line 61: | ||
| [[ITK/Release_4/A2D2_Projects/Large Histology Segmentation and Visualization|Large Histology Segmentation and Visualization]] || || || || || | | [[ITK/Release_4/A2D2_Projects/Large Histology Segmentation and Visualization|Large Histology Segmentation and Visualization]] || || || || || | ||
|- | |- | ||
| [[ITK/Release_4/A2D2_Projects/Physics-Based Non-rigid Registration|3D Real-time Physics-based Non-rigid Registration for Image-guided Neurosurgery]] || | | [[ITK/Release_4/A2D2_Projects/Physics-Based Non-rigid Registration|3D Real-time Physics-based Non-rigid Registration for Image-guided Neurosurgery]] || X || X || X || || | ||
|- | |- | ||
| [[ITK/Release_4/A2D2_Projects|Denoising]] || X || X || || || | | [[ITK/Release_4/A2D2_Projects|Denoising]] || X || X || || || | ||
|} | |} |
Latest revision as of 15:13, 20 June 2012
Overview
Dashboard of ITKv4 Efforts
Completed Efforts
Defined as having examples, tests, migration guide, and documentation; as well as being accepted through gerrit
- Modernizing ITK's Software Process
- Managing Contributions
Ongoing Efforts
Defined as having completed design with work underway. High likelihood of completion by Dec 31, 2011.
- DICOM
- Wrapping
- SimpleITK
- Refactoring Level Set Framework
- Migration Plan
- Refactor Numerical Libraries
- Why Switch to ITKv4
- Outreach
- Refactoring FEM Framework
- Enhancing Image Registration Framework
Demonstrations/Discussions
Defined as low likelihood of completion, e.g., limited to being a concept demonstration by Dec 31, 2011.
A2D2s
A2D2 | Discussion | Ongoing | Committed to Gerrit | Completed | Notes |
---|---|---|---|---|---|
Lesion Sizing Toolkit | X | X | X | X | |
SCORE | X | X | |||
SCORE++ | X | X | |||
Video Bridge | X | X | X | X | CVPR Demonstration |
Registration Parameter Tuning | X | X | X | ||
VideoGrabber | |||||
Deconvolution Algorithms | |||||
Microstructure for Cancer Studies | |||||
Large Histology Segmentation and Visualization | |||||
3D Real-time Physics-based Non-rigid Registration for Image-guided Neurosurgery | X | X | X | ||
Denoising | X | X |